Skip to content

Buying guide

RFQ checklist: what to ask a commercial refrigeration supplier

Most buyers compare refrigeration quotes on price and litres, then discover the real differences after installation: one unit cannot cope with the kitchen heat, another needs a stabiliser that was not quoted, a third has no service centre in your city. A clear request for quotation (RFQ) forces suppliers to answer the same questions, so you compare like with like. Use this checklist for a single cabinet or a full fit-out.

7 min readUpdated

What to send suppliers

Good quotes start with good information. Give every supplier the same brief.

  • What you will store in each unit and the temperature you need.
  • Where each unit will stand: kitchen, store front, back room, AC or non-AC, and roughly how hot it gets in summer.
  • Space available: width, depth, height, door swing and the route into the building, including lift and doorway sizes.
  • Power available at each position and any known voltage problems.
  • Usage: how often doors open, peak service times and whether staff or customers use the unit.
  • Your timeline, delivery address and whether installation is needed.

Performance questions

  • What temperature range does the unit hold, and at what ambient temperature was that tested?
  • What is the pull-down time from ambient to operating temperature, with and without load?
  • Is cooling static or forced-air, and how even is the temperature from top to bottom?
  • What is the operating voltage range, and is a stabiliser recommended or included?
  • What is the energy consumption, and under what test conditions? Does it carry a BEE label where one applies?

Construction questions

Construction details to request
Ask aboutWhy it matters
Steel grade inside and outDecides resistance to corrosion, salt and cleaning chemicals
Insulation type and thicknessAffects running cost and temperature stability
Refrigerant typeAffects efficiency, servicing and future availability
Condenser position and clearancesDecides whether it fits your joinery and space
Shelf count, load rating and adjustabilityDecides how much of your actual stock fits
Door type, gaskets and hingesHigh-wear parts that drive repair frequency

Commercial questions

  • Is the price inclusive of GST, delivery, unloading, installation and commissioning?
  • What are the payment terms, and when does the warranty start: invoice, delivery or installation?
  • What is the delivery lead time, and what happens if it slips?
  • Are accessories, stabilisers, castors or extra shelves included or extra?
  • How long is the quote valid?

Service and support questions

  • What does the warranty cover, for how long, and what is excluded?
  • Where is the nearest authorised service point, and what is the committed response time?
  • Which spares are stocked locally?
  • Is an annual maintenance contract available, and what does it include?
  • Will the supplier train staff on cleaning, loading and basic checks at handover?

Red flags in a quotation

  • Capacity quoted only as gross litres, with no shelf count or usable dimensions.
  • No stated ambient rating, or a rating that only applies to a cool, air-conditioned room.
  • Steel described only as 'stainless' with no grade, or a different grade inside and out that is not disclosed.
  • Warranty described in one line with no mention of labour, compressor or exclusions.
  • Prices that exclude installation, delivery or a stabiliser that the supplier also says is required.
  • Reluctance to put performance claims in writing.

Comparing the quotes

Put the answers into one sheet with a row per question and a column per supplier. Blank cells are information too: a supplier who cannot tell you the rated ambient or the steel grade is telling you something. Convert every quote to a full landed cost including delivery, installation, stabiliser and any extras, and add an estimate of running cost over the years you expect to use the equipment.

Ask for a site visit for large or built-in jobs. A supplier who measures the space, checks ventilation and points out problems before you order is usually the one who will support you after installation.

Frequently asked questions

How many quotes should I get?
Three comparable quotes is a common rule of thumb. More is useful only if each supplier answers the same questions; ten vague quotes are harder to compare than three detailed ones.
Should I always choose the lowest quote?
Only if it meets the same specification and service terms. Compare landed cost, running cost and support, not just the headline price.
Should I share my budget in the RFQ?
Sharing a range can help suppliers propose the right class of equipment instead of the cheapest or most expensive option. Keep the specification fixed so all quotes answer the same brief.

Products in this guide

Industries

Related guides